By their very nature, construction projects can create seemingly endless opportunities for conflict. Written by a best selling author with over 40 years of experiences in the construction and general contracting business, Construction Process Planning and Management provides you with the necessary tools to save time and money on your construction project. In this book, Sid Levy provides valuable advice for avoiding or working through the common problems that are a result of the long-term nature of construction projects, failure to select a ? project delivery system? appropriate to the project, incomplete drawing and specifications, unrealistic scheduling, poor communication and coordination among participants, and inadequate contract administration. From project genesis, through design development to contractor and contract selection, on to construction oversight, punch list and successful project close-out, this book will point out those pitfalls to avoid and offer practical advice at every step along the way.
- Administer the general construction process including solicitation of contractor's qualifications (pre-qualify bidders), comparative analysis of bid packages, recommendation for contract award, contract document negotiation and documentation of job change orders
- Provide Project Planning and on-site management and coordination of all construction projects
- Ensure compliance of building construction rules and regulations and collaborate with chief engineers to monitor quality of construction
- Conduct technical/plan review of construction documents and submit written responses identifying required corrections or changes
- Design, implement and oversee Company standards for construction policies, practices and processes
Inhaltsverzeichnis
1;Front cover;1 2;Construction process planning and management: An owner's guide to successful projects;2 3;Copyright page;3 4;Contents;4 5;Preface;10 6;Chapter 1 The genesis of a construction project;12 6.1;Architectural industry snapshot;12 6.2;The architect and the client;13 6.3;The construction industry;13 6.4;An owner's major commitment;14 6.4.1;Project delivery;14 6.4.2;Green and sustainable building;19 6.5;Contracts and the contractor;20 6.6;Ethics in the construction industry;21 7;Chapter 2 Selecting and working with an architect;24 7.1;The changing world of the architect;25 7.2;The architect and engineer selection process;25 7.2.1;The architect's qualification statement;25 7.2.2;Interviewing an architect;27 7.3;The architect's team;28 7.3.1;Building information modeling;29 7.4;Defining the services of the design team;30 7.4.1;Contract administration;31 7.4.2;Owner's responsibility for services;32 7.4.3;Inspection services;33 7.5;Preparation of the bid documents;36 7.5.1;The prebid conference;37 7.6;Contract-administration services;39 7.6.1;The preconstruction conference;39 7.7;The owner-architect contract for services;41 7.8;The design process;41 7.9;Negotiating the architect's fee and other forms of compensation;46 7.9.1;The case for reimbursable expenses;52 7.9.2;The standard architect agreement;52 7.10;The owner's role in the design process;53 7.10.1;Constructability and coordination;54 8;Chapter 3 The architectural, engineering, and contracting industries;56 8.1;The architectural profession;56 8.1.1;The architect's intern program;57 8.1.2;State licensing requirements;57 8.2;Landscape architects;58 8.2.1;Education, training, and certification;58 8.3;The construction-related engineering profession;58 8.3.1;Structural engineers;59 8.3.2;Mechanical engineers;60 8.3.3;Electrical engineers;60 8.3.4;The materials engineer;61 8.4;The construction industry;61 8.4.1;Size and revenue of contractors;62 8.4.2;Risky business;63 8.4.3;The age of the master builder;67
8.4.4;A typical general contracting company organization;68 8.4.5;Salary levels;71 8.4.6;The shift to subcontracted work;71 8.4.7;The double-breasted contractor;72 8.4.8;Differences between union and nonunion;72 8.5;The construction manager;74 8.6;The design-builder;75 8.7;Program management;75 9;Chapter 4 Construction contracts pros and cons;78 9.1;The letter of intent;78 9.2;Types of construction contracts;81 9.2.1;Stipulated or lump-sum contract;81 9.2.2;Value engineering;83 9.2.3;Cost of the work plus a fee contract;84 9.2.4;Cost plus a fee with a guaranteed maximum price contract;86 9.2.5;Construction-management contract;94 9.2.6;Design-build contract;98 9.2.7;Bridging contract;100 9.3;The general conditions to the contract for construction;101 9.3.1;The AIA general conditions document;102 9.4;Standard contract forms;104 9.4.1;American Institute of Architects contracts;104 9.4.2;Associated General Contractors of America contracts;104 9.4.3;Construction Management Association of America contracts;105 9.4.4;Design-Build Institute of America contracts;105 9.5;Documents synopses by series;106 9.5.1;A series;106 9.5.2;B Series;113 10;Chapter 5 Preparing the bid documents;124 10.1;The contractor qualification process;124 10.1.1;Safety and quality issues;126 10.1.2;References;127 10.1.3;The invitation to bid;132 10.2;Insurance and bonds;135 10.2.1;Owner- and contractor-controlled insurance programs;136 10.2.2;Construction surety bonds;137 10.2.3;Subguard;139 10.2.4;Letter of credit;139 10.3;General conditions;139 10.4;Evaluation of the bid;142 10.5;Contractor selection;145 11;Chapter 6 The construction contract;148 11.1;Schedule-of-values exhibit;149 11.2;Exhibits;152 11.2.1;Alternate exhibits;152 11.2.2;Allowance exhibits;155 11.2.3;Unit prices;156 11.3;Guaranteed maximum price (GMP) contract;157 11.3.1;Limiting an owner's exposure to final plan development costs;159 11.3.2;Documenting general conditions costs;160 11.4;Change orders;160 11.4.1;Controlling overhead an
d profit;165 11.5;Including a "definitions" section in the contract;167 11.6;Liquidated damages;167 11.7;Additional contract provisions;169 12;Chapter 7 Organizing for the construction process;176 12.1;Architectural forms;176 12.2;The project meeting;177 12.2.1;Shop drawings;181 12.2.2;Material and equipment substitutions;181 12.2.3;Value engineering;182 12.2.4;Project schedule;183 12.2.5;Importance of the owner's role;184 12.2.6;Requests for information;187 12.2.7;Architect's supplemental instructions and field instructions;190 12.2.8;The submittal log;190 12.2.9;Pace of construction;195 12.2.10;Contractor's application for payment;195 12.2.11;Offsite material and equipment storage;203 12.3;Project closeout;204 13;Chapter 8 Change orders;212 13.1;Change-order provisions in the AIA general conditions document;214 13.2;Review procedures for change orders;216 13.3;Documentation of change-order work;217 13.4;Cost issues;220 13.5;Changes in scope of work;221 13.6;Change orders and scheduling;226 13.6.1;Float and the schedule;227 13.7;Quantum meruit and unjust enrichment;232 14;Chapter 9 Green and sustainable buildings;234 14.1;The impact of construction on the environment;234 14.2;Whole-building design;235 14.2.1;The U.S. Green Building Council;236 14.3;Promoting green buildings;240 14.4;Green building components;245 14.5;EPA's energy performance ratings;246 14.6;The U.S. Department of Energy Building Technologies Program;249 14.7;Energy modeling;251 14.8;Green infrastructure;252 14.8.1;Low-impact development;252 14.8.2;Geothermal heating and cooling;253 14.8.3;Fenestration;254 14.9;How cost effective are green buildings?;254 14.10;Green building products and processes;256 14.11;Sustainability;256 14.12;The risks and pitfalls in green building design;259 15;Chapter 10 Disputes and claims;262 15.1;Documentation in the bidding process;262 15.2;Documentation during construction;264 15.3;Principal causes of disputes and claims;265 15.3.1;Contract issues;265 15.3.2;Plans and
specifications containing errors or omissions;267 15.3.3;Lack of proper drawing coordination;268 15.3.4;Incomplete or inaccurate responses;270 15.3.5;Inadequate administration of the project;270 15.3.6;Unwillingness to comply with the intent of the drawings;271 15.3.7;Site conditions that differ materially from the contract documents;271 15.3.8;Unforeseen subsurface conditions;274 15.3.9;A change in conditions;275 15.3.10;Discrepancies in the plans and/or specifications;276 15.3.11;Disruptions to the normal pace of construction;277 15.3.12;Inadequate financial strength of any party;278 15.4;Delays and the problems they cause;279 15.5;Legal precedents relating to construction claims;283 15.5.1;Differing site conditions;283 15.5.2;Complete set of drawings;283 15.5.3;Damages for breach of contract;283 15.5.4;Electronic records;284 15.6;Contractor's guarantee of design;284 15.6.1;Withholding payment due to defective or incomplete work;284 15.6.2;Claim for lost productivity;285 15.6.3;Prompt review of shop drawings;285 15.7;Generic guidelines for coordination drawing;286 15.7.1;Effective claim development and preparation;287 16;Chapter 11 Basic construction components;288 16.1;Site work;288 16.2;Foundations;289 16.3;Site utilities;291 16.4;Concrete;291 16.5;Structural steel;293 16.6;Masonry;296 16.6.1;Bricks;296 16.6.2;Concrete-masonry units;299 16.6.3;Mortar;299 16.6.4;Wall reinforcement;302 16.7;Glass and glazing;302 16.8;Roofing;303 16.9;Drywall partitions and ceiling construction;303 16.9.1;Fire-rated partitions;304 16.9.2;Sound-rated partitions;305 16.9.3;Moisture resistance;305 16.9.4;Exterior sheathing;305 16.10;Doors and frames;306 16.11;Finishes;306 16.12;Plumbing;308 16.13;Heating, ventilating, and air conditioning;310 16.14;Fire-protection systems;313 16.15;Electrical systems;316 17;Glossary of architectural and construction terms;318 17.1;A;318 17.2;B;320 17.3;C;321 17.4;D;323 17.5;E;324 17.6;F;325 17.7;G;326 17.8;H;327 17.9;I;328 17.10;J;328 17.11;K;329 17.
12;L;329 17.13;M;330 17.14;N;331 17.15;O;331 17.16;P;331 17.17;Q;334 17.18;R;334 17.19;S;335 17.20;T;337 17.21;U;338 17.22;V;338 17.23;W;339 18;Appendix A. Construction management owner-contractor contract;340 19;Appendix B. American Institute of Architects stipulated sum contract;366 20;Appendix C. American Institute of Architects cost of work plus a fee with a guaranteed maximum price (GMP) contract;374 21;Index;388 21.1;A;388 21.2;B;388 21.3;C;388 21.4;D;390 21.5;E;391 21.6;F;391 21.7;G;391 21.8;L;391 21.9;M;391 21.10;O;391 21.11;P;391 21.12;Q;392 21.13;R;392 21.14;S;392 21.15;T;392 21.16;U;392 21.17;V;392 21.18;W;392